Pre Construction Treatment

Pre Construction Treatment:

For effective control of termites, control treatment has to be applied in different stages of construction.

  • Treat the bottom and the sides of the foundation pits.
  • Treat the back fill earth on all sides of built up walls to a depth of 45 cm and width of 30 cm.
  • Treat the top surface of the center grated and leveled¬† earth, within the the plinth walls.
  • Treat the earth along the external perimeter of the building.
Share This